B) Left-to-right flow
1. Connect the cable indicating CROSS, to CN1 of CPU board: SCMYEX.
2. Connect the connector CNLI located at the left side of the downstream machine with the connector CNRI located at the right side of SP main body.
C) Right-to-left flow
1. Connect the cable indicating STRAIGHT, to CN1 of CPU board: SCMYEX.
1D3C-828E
2. Connect the connector CNRI located at the right side of the downstream machine with the connector CNLI located at the left side of SP main body.
Email:smt@smtsky.com,Website:www.smtsky.com Email:smt@smtsky.com,Website:www.smtsky.com
1D3C-829E
Page 1-20 1E3C-E-IMB01-A01-02
1.1 Preparations for Installation
1.1.8 Line Connection Precautions
1. When you couple this machine with the other ones in the line, remove the covers of right and left board-loading openings. (For SP80V-MU/L and SP60P-MU/L)
Cover of board-loading opening
(Located on both sides)
Email:smt@smtsky.com,Website:www.smtsky.com Email:smt@smtsky.com,Website:www.smtsky.com
2. There should be no clearances more than necessary between, in the line, this machine and the other ones.
1D3C-832E
1E3C-E-IMB01-A01-02 Page 1-21 1.2 Installation Procedure
1.2 Installation Procedure
NOTICE The machine should be installed under the direction of an expert. This section describes the summary of the procedure. For information about the reLOCAIION of the machine, make contact with our service center.
1. Machine transport state Board lift, recognition unit, and squeegee head are secured by fixing brackets so that they will not move during transport.Remove the fixing brackets in the setup of the machine. Store the removed brackets.
Board-POSTTTIONing lift
Email:smt@smtsky.com,Website:www.smtsky.com Email:smt@smtsky.com,Website:www.smtsky.com
Touch panel
Fixing bracket (On both ends)
Fixing bolt
1D3C-812E 1D3C-831E 1D3C-AQ
Board stopper
Fixing bracket
Email:smt@smtsky.com,Website:www.smtsky.com Email:smt@smtsky.com,Website:www.smtsky.com
1D3C-813E
Email:smt@smtsky.com,Website:www.smtsky.com Email:smt@smtsky.com,Website:www.smtsky.com
Page 1-22 1E3C-E-IMB01-A01-02 1E3C-E-IMB01-A01-03 Page 1-23 1.2 Installation Procedure
1.2 Installation Procedure
Print inspection head(SP80V only) Recognition head (SP60P only)
Email:smt@smtsky.com,Website:www.smtsky.com Email:smt@smtsky.com,Website:www.smtsky.com
Fixing bracket Fixing bracket Fixing bracket
1D3C-831E
1D3C-818E
1D3C-816E
1D3C-AZ 1D3C-BC
Recognition drive unit Squeegee head
Email:smt@smtsky.com,Website:www.smtsky.com Email:smt@smtsky.com,Website:www.smtsky.com
Fixing bracket 1D3C-814E Fixing bracket
1D3C-817E
1D3C-AZ
Mask cleaning unit
Fixing bracket
Email:smt@smtsky.com,Website:www.smtsky.com Email:smt@smtsky.com,Website:www.smtsky.com
1D3C-815E
2. Installing the machine Install the machine along the reference line.Adjust the machine POSTTTION for smooth board transport between the previous and next processes.(Align the orientation and the transport height with those of the reference machine.)
3. Peripheral equipment Following the procedures in section 1.3, install PATLITE, blower, and atmospheric temperature control unit.For the line specifications, connect the signal cables seeing section 1.1.6.
4. Accurately making the machine level
(1)Open the cleaning cover on the front.
(2) Remove the mounting bolts for the Y-axis ball-screw cover, and draw out the cover
frontward.