您好,欢迎来到商国互联!

收藏本站

商国互联

点击查看优质供应商

当前位置:商国互联首页> 供应信息

供应PCB Printer Part PCB印刷机配件 

供应PCB Printer Part PCB印刷机配件

  • 品 牌:
  • 价 格:面议 /
  • 供 应 地:广东省珠海市
  • 包装说明:
  • 产品规格:
  • 运输说明:
  • 交货说明:
  • 发布日期:2014/11/28 9:02:16
  • 联系人QQ:751981282 点击这里给我发消息

详细说明

详细说明Explain

供应PCB Printer Part PCB印刷机配件
B)  Left-to-right  flow      
1.  Connect  the  cable  indicating  CROSS,  to  CN1  of  CPU  board:  SCMYEX.      
                          
2.  Connect  the  connector  CNLI  located  at  the  left  side  of  the  downstream  machine  with  the  connector  CNRI  located  at  the  right  side  of  SP  main  body.      
C)  Right-to-left  flow      
1.  Connect  the  cable  indicating  STRAIGHT,  to  CN1  of  CPU  board:  SCMYEX.      
1D3C-828E      
          
2.  Connect  the  connector  CNRI  located  at  the  right  side  of  the  downstream  machine  with  the  connector  CNLI  located  at  the  left  side  of  SP  main  body.      
      
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com
        
      
      
1D3C-829E      
Page  1-20  1E3C-E-IMB01-A01-02      
1.1  Preparations  for  Installation      
1.1.8  Line  Connection  Precautions      
1.  When  you  couple  this  machine  with  the  other  ones  in  the  line,  remove  the  covers  of  right  and  left  board-loading  openings.  (For  SP80V-MU/L  and  SP60P-MU/L)      
Cover  of  board-loading  opening      
(Located  on  both  sides)      
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com
2.  There  should  be  no  clearances  more  than  necessary  between,  in  the  line,  this  machine  and  the  other  ones.      
1D3C-832E      
1E3C-E-IMB01-A01-02  Page  1-21  1.2  Installation  Procedure      
      
      
1.2  Installation  Procedure      
NOTICE  The  machine  should  be  installed  under  the  direction  of  an  expert.  This  section  describes  the  summary  of  the  procedure.  For  information  about  the  reLOCAIION  of  the  machine,  make  contact  with  our  service  center.      
      
1.  Machine  transport  state  Board  lift,  recognition  unit,  and  squeegee  head  are  secured  by  fixing  brackets  so  that  they  will  not  move  during  transport.Remove  the  fixing  brackets  in  the  setup  of  the  machine.  Store  the  removed  brackets.        
Board-POSTTTIONing  lift        
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com
Touch  panel      
Fixing  bracket  (On  both  ends)      
Fixing  bolt        
      
      
        
1D3C-812E  1D3C-831E  1D3C-AQ      
        
  Board  stopper        
Fixing  bracket        
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com
      
      
        
1D3C-813E        
        
        
        
        
        
        
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com
        
        
        
        
        
        
        
Page  1-22  1E3C-E-IMB01-A01-02  1E3C-E-IMB01-A01-03  Page  1-23  1.2  Installation  Procedure      
    1.2  Installation  Procedure        
    Print  inspection  head(SP80V  only)        Recognition  head  (SP60P  only)        
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com
  Fixing  bracket    Fixing  bracket      Fixing  bracket        
                
      1D3C-831E        
    1D3C-818E        
        
1D3C-816E        
            
1D3C-AZ    1D3C-BC        
Recognition  drive  unit    Squeegee  head        
            
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com
        
        
        
Fixing  bracket        1D3C-814E    Fixing  bracket        
        
1D3C-817E        
1D3C-AZ        
            
Mask  cleaning  unit        
  Fixing  bracket            
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com
        
1D3C-815E        
        
2.  Installing  the  machine  Install  the  machine  along  the  reference  line.Adjust  the  machine  POSTTTION  for  smooth  board  transport  between  the  previous  and  next  processes.(Align  the  orientation  and  the  transport  height  with  those  of  the  reference  machine.)      
      
3.  Peripheral  equipment  Following  the  procedures  in  section  1.3,  install  PATLITE,  blower,  and  atmospheric  temperature  control  unit.For  the  line  specifications,  connect  the  signal  cables  seeing  section  1.1.6.      
4.  Accurately  making  the  machine  level      
(1)Open  the  cleaning  cover  on  the  front.      
(2)  Remove  the  mounting  bolts  for  the  Y-axis  ball-screw  cover,  and  draw  out  the  cover      
frontward.      
Email:smt@smtsky.com,Website:www.smtsky.com    Email:smt@smtsky.com,Website:www.smtsky.com

 

在线询盘/留言Online Inquiry

  • *您的姓名:

  • *联系手机:

  • 固话电话:

  • E-mail:

  • 所在单位:

  • 需求数量:

  • *咨询内容:

免责声明:交易有风险,请谨慎交易,以免因此造成自身的损失,本站所展示的信息均由企业自行提供,内容的真实性、准确性和合法性由发布企业负责。本站对此不承担任何保证责任。
商国互联供应商 品质首选

珠海市龙健电子有限公司

  • 联系人:韩玉标(业务部经理)
  • 手机:

    尚未认证,请谨慎交易

  • 会员级别:免费会员
  • 认证类型:未认证
  • 尚未认证,请谨慎交易
  • 主营产品:SMT SMT配件 SMT耗材
  • 公司所在地:广东省珠海市