
济南塑胶篮球场施工
According to the stalls shop first layer method, the Pu in strict accordance with the mixing ratio of mixing and began paving, paving, professional fire bubble tool will PU material mixed reaction to the elimination of air bubbles out, so that you can achieve beautiful results.
联系人:魏经理
济南华体佳业体育设施有限公司坐落于美丽泉城济南。公司是集设计、销售、工程、服务为一体的全系列体育产业公司;公司地址位于山东省济南市堤口路名泉春晓商务楼2210室。
Ji'nan huati JIAYE sports facilities Co. Ltd is located in the beautiful city of Ji'nan. Company is set design, marketing, engineering and services as one of the full range of sports industry company; company address is located in Shandong Province Jinan Dikou road springs Chunxiao business building room 2210.
公司已制定五年发展规划,拟在五年内打造成在国内同行业具有一定影响力的大型体育产业集团,力争到2020年销售收入达5000万。我们将按照“靠人才、靠科技、靠市场、靠智慧”发展的思路,坚持走“科技支撑,创新驱动,推动体育产业高速发展”之路,将企业做强做大,努力为中国体育产业及全民健康事业的不断发展做出更大的贡献。
The company has formulated five year development plan, plans to build in five years in the domestic same industry has certain influence large-scale sports industry group, and strive to 2020 sales revenue reached 50000000. We will in accordance with the "relies on a talent, rely on science and technology, rely on the market, rely on wisdom" development ideas, adhere to go "science and technology support, innovation driven, to promote, the rapid development of sports industry", the enterprises grow in size and strength to the development of sports industry in China and the cause of national health make a greater contribution.
我们真诚希望与热爱体育事业的体育界同仁、各大院校等进行广泛交流,建立长期的合作关系,携手共赢,共创未来!
We sincerely hope that with the sports industry, sports industry colleagues, the school and other major schools to carry out extensive exchanges, the establishment of long-term cooperative relations, hand in hand to create a better future!
塑胶跑道施工PU底层的铺设:
Plastic runway construction PU the laying of the underlying:
1.待防水层干透后,把球场PU料按照配比要求,称准确后,倒入搅拌桶内,先倒入PU料的乙组,再倒入甲组,再加上适量的催干剂(催干剂的量根据天气而定,天气气温高时,催干剂的量就少下,气温低时,就适量多加)用专业搅拌器,充分对材料搅拌均匀,搅拌时间为三分钟左右,搅拌均匀后,把材料拉到施工现场按要求倒下,然后用专业的PU耙,用适量的高度将料按球场的流水方向耙平,拉耙时速度要均匀和不要速度过快或过慢,过快PU料流平会很差,过慢时PU料会从耙的两边流出。
1 the waterproof layer should be dry, the court in accordance with the ratio requirements of PU material, said accurately, into the mixing bucket, pour in group B of PU material, and then poured into the group, plus the amount of driers (driers and the volume according to the weather, air temperature is high, driers the amount is less, when the temperature is low, then appropriate amount) with professional mixer, full of material mixing, stirring time is three minutes, after mixing evenly, put the material to the construction site according to the requirements of fall, and then use the PU rake professional, with the amount of the material flow direction according to the height of Pa Ping stadium rake speed should be uniform, and not too fast or too slow, too fast PU stream will be very poor, too slow when PU material will flow from both sides of the harrow.
试水PU底层完全干固后,现对PU面进行试水,试水的方法和注意事项和前面相同,有积水的地方,再用同样的方法将其补平。
After the bottom of the water PU completely dry solid, is now on the PU surface to test the water, the method and the same attention to the water in front of the same, there is a place of water, and then the same method to fill.
区分颜色区域
Distinguish color area
试水干透后,按照计算要求用钢尺将球场不同的颜色的区域划分开来,然后用厚3mm 海绵胶贴在区分线上,一切就绪后,开始摊铺PU面层。
Test the water after the dry, in accordance with the computational requirements with the ruler will of course different color regions separated and 3mm thick sponge attached to the differences between on-line, everything is ready, began spreading Pu surface layer.
塑胶跑道施工PU第二层的铺设
Plastic runway construction PU second layer of laying
按照摊铺第一层的方法,把PU严格按照比例混合搅拌均匀,开始摊铺,摊铺时,用专业消泡工具将PU料混合反应的气泡消除掉,这样就可以达到美观的效果。
联系方式:13969090296 0531-58712304
公司网址:www.jntiyu.com
联系地址:山东省济南市堤口路名泉春晓商务楼2210室
中国升降机制造网:升降机 www.shengjiangji.biz
www.weidaoshang.com 济南微信营销,济南微营销,济南微信推广
诺商商道系统,-专业互联网应用服务提供商:www.chinanovo.net
诺商商道系统,-专业互联网应用服务提供商:www.cn-un.net
诺商基于多年的优化经验和品牌基础推出的诺商商道系统,诺商信息您身边的互联网专家!
*您的姓名:
*联系手机:
固话电话:
E-mail:
所在单位:
需求数量:
*咨询内容:
尚未认证,请谨慎交易