DZH4-1.25-T single steam boiler ancillary equipment
list
Serial number Name of goods Specification model
Company number remarks
One Boiler main engine
⑴ Boiler main engine DZH4-1.25-T platform 1
⑵ Chimney flue set 1
Two Auxiliary
⑴ Induced draft fan Y5-47No-6C platform 1
18.5KW
⑵ Blower 4-72-4A platform 1 5.5KW
⑶ Electric control cabinet RF-Ⅱ platform
1
⑷ Feed water pump platform 1 7.5kw
⑸ steam manifold φ325 platform 1
⑹ a duster platform 1
⑺ water treatment platform 1
Three Valves and instruments
⑴ Full swing spring safety valve A48H-1.6C
PN1.6 DN50 piece 2 1.2-1.6MPa
⑵ Globe valve J41T-1.6
PN1.6 DN100 件 1 Main steam
⑶ Globe valve J41T-1.6
PN1.6 DN40 件 1 Auxiliary steam
⑷ Globe valve Z41H-1.6
PN1.6 DN40 件 1 water supply
⑸ Drain valve Z44H-1.6
PN1.6 DN40 件 3 Sewage
⑹ Three-way Stopcock X14A-1.6
PN1.6 DN15 件 2 pressure
⑺ Pressure gauge Y-150
M20×1.5,2.5 level 件 2 0-2.5MPa
⑻ Plate water level gauge M350H
PN1.6 DN25 件 2 L=350
⑼ UDZ-453A-G Water level alarm controller 件
1 L=350
Serial number Name of goods Specification model
Company number remarks
Four List of drawings and technical
documents
⑴ General layout of boiler DZH4-1.25-T Zhang 1
⑵ Boiler body DZH4-1.25-T Zhang 1
⑶ Pipeline instrument valve DZH4-1.25-T Zhang
1
⑷ foundation DZH4-1.25-T Zhang 1
⑸ Smoke duct DZH4-1.25-T Zhang 1
⑹ Installation instructions Type DZH series share
1
⑺ Summary table of strength calculation results
DZH4-1.25-Ttype share 1 WJ0940-3
⑻ Factory list of products DZH4-1.25-Ttype share
1
⑼ Certificate of quality share 1
⑽ Boiler product safety and quality supervision and
inspection certificate share 1 周口锅检所
⑾ Certificate of compliance φ325 set 1
⑿ Cylinder drawing φ325 set 1
⒀ Boiler sample Henan Province, hot Feng Boiler Co.,
Ltd. set 1
Six Equipment factory total price (RMB) 136000 yuan
(including freight invoice)
1, the list of the annex applicable to the company's
design drawings delineated in the scope of use, the user if there are special
requirements, ordering should be put forward in writing.
2, according to the contents of the list
provided by suppliers, other users to bring their own, if there is objection to
the supply contract shall prevail.